NOTE: Do not upload any image that violates our Picture Policy. Doing so will result in the removal of the concerned image without prior notification.
Crop Picture
Auto Cropped
Note:Microsoft Internet Explorer restricts the images to be uploaded one by one. To upload multiple images at the same time please use other browser.
Ahmad Ismail, PMP, RMP
Construction Manager Civil
ICAD Company - Riyadh, Saudi Arabia
Summary
Target Job Title Project Manager, Constructions Manager, PMP, RMP
Career Level Management
Target Job Location Saudi Arabia , Emirates , Qatar
Career Objectives Qualified Project Executive Manager For constructions And Cost Control , Seeking For Project Management Position In A Well Firm Or Company, To Apply Accrued Practical Skills And Projects Management Knowledge In Contributing Towards The Achievement Of Tangible And Intangible Organizational Objectives .
Target Industry Construction Engineering
Employment Type Employee
Employment Status Full Time
Notice Period 1 Month or less
Birth Date 04 November 1979 (Age 37)
Gender Male
Nationality Egypt
Residence Country Jeddah, Saudi Arabia
Visa Status Residency Visa (Transferable)
Marital Status Married
Number of Dependents 4
Driving License Issued From Egypt, Saudi Arabia
Projects
Site Engineer
Site Engineer
Project Manager
Project Manager
Site Engineer
MANAGEMENT / Project Manager
Project Manager
Experience
Construction Manager Civil
ICAD Company
Nov 2017
- Present
| Riyadh, Saudi Arabia
Construction Manager
At Innovative Contractors For Advanced Dimensions Company (ICAD).
Web Site: www.icad.com
Location: Riyadh, Saudi Arabia
Company Industry: Constructions Company Size: About 2500 Employees
Job Role: Engineering
November 2017 - Till Now.
Projects: Royal OJAH Palace at Wadi Hanifah, Riyadh
Owner: The Royal Private Affairs
Consultant: Saudi Diyar Consultant
Scope Of Work:
Construction of New Data Center Building 300 M2 one Floor, with External Stamped Concrete Area 1200 M2 for Parking, Infrastructure Duct Bank, Manholes for Low Current Fiber Cable with Length near to 3 Km, Fiber Glass Pre-Casting Poles Foundations, Security Physical System ( Road Blocker No 12, Sliding gate No 2 ) With Total Amount 65 million SAR
Scope And Roles:
Civil Construction Manager for Data Center Building, Infrastructure Works as Execution and Engineering Documentation.
Role And Responsibility:
Following Up The Master Project Plan For All Phases.
Preparing Shop Drawings Structure, And Coordinating With MEP Drawings .
Execution Of Structure.
Following Up Of MEP Works.
Lead And Following Up Project Team Performance.
Following Up Sub-Contractors.
Preparing Material Submittals, and Other Technical office Documents.
PROJECT MANAGER
PARTNERS OF DEVELOPMENT FOR CONSTRUCTIONS
Apr 2008
- Present
| Jeddah, Saudi Arabia
Scope Of Role
Preparing Projects Construction Plan .
Study And Choosing The Suitable Staff For Each Project.
Sharing With Owners In Design Phase To Preparing Stru/Arch/MEP Drawings And Tenders For New Brands (NCB, ALJLH, First Group International) .
Following Up Preparing Time Schedule.
Lead Technical Office Team to preparing Shop Drawings And Purchasing Orders For Glass, Cladding , Stru, Arch Works.
Manage Projects Construction Team Stru, Arch, MEP And Following Up Coordinating Between Drawings.
Negotiations with Sub-Contractors .
Following Up Preparing Shop Drawing Stru, Arch .
Following Up Preparing Performance Reporting .
Projects monitoring For Quality Control .
Following Up Projects Cost Control With Financial Management.
Interviews With Applicants And Evaluation them For The General Manager .
Education
Cairo University
Bachelor,
Bachelors,
Bachelors in Architecture,
Bachelor’s Degree, Civil Engineering
At High Dam Company For Electrical And Industrial Projects
Location:10 th of Ramadan, Egypt
Company Industry: Electrical Construction
Job Role:Engineering
August 2002 – July 2003
Project: 10 th of Ramadan Power Plant 220 KV
Owner: The Ministry Of Electricity.
Scope of work:
Construction Of A New Power Plant, Consists Of 2 Main Buildings (Control Building 2 Floors With Panelled Beam System , Cables Building With Concrete Structural Frame 13 meter height,14 meter Span , Transformers 220 KV Bases, Fire Rated Retaining Walls 9 Meter High, Concrete Cables Tunnels, Plants area, Concrete Guards Towers, Concrete High Water Tank 220 cubic meter, Asphalt Roads, Concrete Roods , with Total Amount 200 Million EGP .
Role Responsibility:
Execution And Following Up Structure Works .
Following Up Project Workers Performance
Preparing Up Sub-Contractors
Preparing Reinforced Steel Shop Drawings
Preparing Consultant Reports
At High Dam Company For Electrical and Industrial Projects
Location:Alfayoum, Egypt
Company industry: Electrical Construction
Job Role:Engineering
July 2003 – May 2004
Projects:High Voltage Electric Line 220 KV , Alfayoum – Bni Suif – Maghagha
Owner:The Ministry of Electricity
Scope of Work:
Construction Of A New High Voltage Electric Towers 220 KV, Consists Of Steel Skeleton, MEP Works, With Total Amount 6 Million EGP.
Role Responsibility:
Following Up The Master Project Plan
Manage Sub-Contractors As A Consultant.
Coordinating Between Owner , And Sub-Contrators.
Preparing Project Shop Drawing Structure.
Preparing Consultant Reports.
At High Dam Company For Electrical And Industrial Projects
Location:Tripoli, Libya
Company Industry: Electrical Construction
Job Role:Management
June 2004 – April 2005
Projects:High Voltage Electric Line 220 KV , Shakshok – Ber El Ghanam
Owner: The Ministry Of Electricity.
Scope of work:
Construction Of A New High Voltage Electric Towers 220 K.V, Consists Of Steel Skeleton, MEP Works, Consultant From Holland, With Total Amount 8 Million LYD.
Role Responsibility:
Execution Of Cadastral, Structure Works, With Classic And Turkish Method .
Preparing Site Purchasing Orders.
Following Up Sub-Contractors.
Lead And Following Up Sub-Contractors.
Mange Maintenance Of All Equipment ( Cranes , Digger ).
Preparing Consultant Reports.
At Bet El Naffisah For Construction Est.
Location:Al Qassim, Saudi Arabia
Company Industry:Construction
Job Role:Management
June 2005 – February 2008
Projects:Boys Schools
Owner: The Ministry Of Education
Scope of work:
Construction Of New Schools Building Consists Of Main Building 2,3 Floors, Included Science, Chemical Laboratories, Soldiers Football Playground With Total Amount 18 Million SAR
Role Responsibility:
Review Tender Drawings Structure/Arch
Preparing Projects Clearances.
Submit, Following Up Materials Approval.
Execution Of Stru, Arch Work.
Follow Up The Master Project Plan.
Lead And Following Up Project Team Performance.
Following Up Sub-Contractors .
At Partners Of Development For Construction Est.
Location: Jeddah , Saudi Arabia
Company Industry: construction
Job Role: Engineering
April 2008 - November 2008
Projects: Almorog Branch, Alfaysaliah Brach in Tabouk City
Owner: The National Commercial Bank
Scope Of Work:
Construction Of A New Branches Of NCB, Structure, Arch, MEP Works, Consists Of Main Building 2 floors, Plants , Marketing Elements With Total Amount 17 million SAR
Scope And Roles: Execution of structure, Arch works following up MEP works
Role And Responsibility:
Following Up The Master Project Plan For All Phases.
Preparing Shop Drawings Structure, Arch And Coordinating With MEP Drawings .
Execution Of Structure, Arch Works.
Following Up Of MEP Works.
Lead And Following Up Project Team Performance.
Following Up Sub-Contractors.
At Partners Of Development For Construction Est.
Location: Jeddah, Saudi Arabia
Company Industry: Construction
Job Role: Management
December 2008 - March 2011
Projects: Tabrgal NCB Branch, The Main Tabouk NCB Branch , Hail NCB Branch , Quick Pay Hail NCB Branch
Owner: The National Commercial Bank
Scope Of Work:
Construction Of New NCB Branches Consists Of Main Building 2 Floors, Site Development Works, Plants , Marketing Elements , With Total Amount 35 Million SAR
Role Responsibility:
Review Tender Drawings Structure Coordinating With MEP Drawings .
Preparing Site Purchasing Orders Struc , Arch , MEP .
Re-Check Of Structural System And MEP Drawings.
Submit Structural / Arch Proposal To Resolve All MEP Issues
Execution Of Struct/Arch Works.
Following Up Of MEP Works.
Lead And Following Up The Project Team Performance.
Projects Summary:
NCB Branches (Three Different Brands)
Stand Alone About 20 Projects
Renovation About 22 Projects
Face Lifting About 4 Projects
Quick – Pay About 13 Projects
With Total Amount 160 Million SAR
Abdul Latif Jameel Land Holding, ALJLH:
Stand Alone Workshop 1 Projects
Renovation Workshops About 2 Projects
Show Rooms About 4 Projects
Fedex Service About 4 Projects
With Total Amount 48 Million SAR
First Group International (El Sharbtly)
Almohamdiah District Center Projects In Jeddah
Renovation About 2 Projects
Maintenance About 1 Projects
With Total Amount 11 Million SAR
Samsung
Showroom In Makah 1 Project
With Total Amount 350 Thousand SAR
Scope Of Role
Preparing Projects Construction Plan .
Study And Choosing The Suitable Staff For Each Project.
Sharing With Owners In Design Phase To Preparing Stru/Arch/MEP Drawings And Tenders For New Brands (NCB, ALJLH, First Group International) .
Following Up Preparing Time Schedule.
Lead Technical Office Team to preparing Shop Drawings And Purchasing Orders For Glass, Cladding , Stru, Arch Works.
Manage Projects Construction Team Stru, Arch, MEP And Following Up Coordinating Between Drawings.
Negotiations with Sub-Contractors .
Following Up Preparing Shop Drawing Stru, Arch .
Following Up Preparing Performance Reporting .
Projects monitoring For Quality Control .
Following Up Projects Cost Control With Financial Management.
Interviews With Applicants And Evaluation them For The General Manager .